Solve Tricky Work Problem: Find Combined Effort Time

In summary: I would work together at a rate of 5 jobs/day. So, it would take us 5x/(5+1)=5x+6 days to complete the task.
  • #1
vin300
603
4
1. A works alone, takes 4 days more to complete the job than if both A and B do together. If B works alone, he takes 16 more days than the situation of working together. The question asks to find how many days it takes for the combined effort, which being apparently simple has unfortunately made me crazy.2. Eq: m+ 4 n = 0.25

The Attempt at a Solution

: Let m part of the job be completed per day when A works alone, in four days he completes 4m. If B completes n per day, he needs 16n extra work to be done[/B]
 
Physics news on Phys.org
  • #2
When several people work together (or pipes fill or empty a tank, etc.) their rates add. Taking "x" to be the time it takes A to do the job alone and "y" to be the time it takes B to finish the job alone, then when A works alone, his rate is 1/x, when B works alone his rate is 1/y, and when they work together their rate is 1/x+ 1/y= (x+ y)/xy

"When A works alone, takes 4 days more to complete the job than if both A and B do together"
A and B together work at rate (x+ y)/xy so it would take them xy/(x+ y) days to complete the job x= xy/(x+ y)+ 4.

If B works alone, he takes 16 more days than the situation of working together.
y= xy/(x+ y)+ 10

Solve those equations for x and y.
Find how many days it takes for the combined effort.
That is, as above, xy/(x+ y).
 
Last edited by a moderator:
  • #3
vin300 said:
Let m part of the job be completed per day when A works alone, in four days he completes 4m. If B completes n per day, he needs 16n extra work to be done
Halls' method certainly works (after correcting a typo), but so does yours, so let's see where it leads.
First, I don't think you mean this: " he needs 16n extra work to be done".
Paralleling what you wrote about A, do you mean "in 16 days he completes 16n"?
Suppose that working together they take x days. How many work units do they complete in x days? What equations can you write for the given information expressed in terms of m, n and x?
 
  • #4
Yes. The method suggested by haruspex seems more intuitively simple to me. Basically, this is similar to a rate-time-distance problem. In your notation, m = rate at which A does work, in jobs/day (similar to km/hr), and n = rate at which B does work, in jobs/day. The rate at which they work together is (m+n) jobs/day. So, to complete 1 job working together, in terms of m and n, how many days does it take? For a to complete 1 job, in terms of m, how many days does it take him? For B to complete 1 job, in terms of n, how many days does it take him?

Chet
 

Related to Solve Tricky Work Problem: Find Combined Effort Time

1. What is a tricky work problem?

A tricky work problem is a task or project that requires a lot of time, effort, and critical thinking to solve. These problems often involve complex calculations, multiple steps, and various factors that need to be considered before arriving at a solution.

2. How do I find the combined effort time for a tricky work problem?

To find the combined effort time, you need to first identify all the tasks or steps involved in solving the problem. Then, determine the time it takes to complete each task individually. Finally, add up all the individual times to get the total combined effort time for the problem.

3. Why is it important to find the combined effort time for a tricky work problem?

Finding the combined effort time helps you understand the overall time and effort required to solve a problem. It allows you to plan and allocate resources effectively, set realistic deadlines, and identify any potential challenges or roadblocks that may arise during the process.

4. Can I use any formula to calculate the combined effort time?

No, there is no specific formula to calculate combined effort time for every tricky work problem. The method for finding the combined effort time may vary depending on the nature of the problem and the tasks involved. It is important to carefully analyze the problem and determine the most suitable approach for calculating the combined effort time.

5. Are there any tips for solving tricky work problems more efficiently?

Yes, some tips for solving tricky work problems efficiently include breaking down the problem into smaller, manageable tasks, prioritizing tasks based on their complexity or urgency, and seeking help or advice from others if needed. It is also crucial to stay organized, stay focused, and take breaks to avoid burnout.

Similar threads

  • Precalculus Mathematics Homework Help
Replies
7
Views
1K
  • Precalculus Mathematics Homework Help
Replies
10
Views
3K
  • Precalculus Mathematics Homework Help
Replies
5
Views
1K
  • Precalculus Mathematics Homework Help
Replies
4
Views
2K
  • Precalculus Mathematics Homework Help
Replies
3
Views
2K
  • Biology and Medical
Replies
2
Views
868
  • Precalculus Mathematics Homework Help
Replies
6
Views
2K
  • Introductory Physics Homework Help
Replies
2
Views
2K
  • Precalculus Mathematics Homework Help
Replies
11
Views
1K
  • Precalculus Mathematics Homework Help
Replies
1
Views
2K
Back
Top