- #1
Rob Inks
- 2
- 0
I have a 40' tall 126" ID reactor that has some weld cracks. I need to pre heat this vessel to roughly 1600 F to drive impurities out of the grain before welding and also needs to be post treated. Has anyone ever done something similar on this large of a scale? I need to find a contractor capable of such a job.