interested in efficiency metrics with regard to our base-load infrastructure... this information is not readily available. I think that renewable stuff has its place only after we make the most of our base plants with load shifting. The base plants exist, and they waste energy. I simply do not...
Hello all, first post. I'm interested in granular load factor statistics for the Palo Verde plant, and LF reporting practices in general. Reviewing the LF stats for PV in the PRIS DB, I'm a bit confused. The annual LF in 2002 was 102. PRIS indicates that 102 is a percentage. What I would...